IC 6010 Westbound at Myrtle MN
The Cedar River local crew back in 2006 passes thru Myrtle on the way to the end of the line at Glenville. The Osage Sub runs for about 18 miles along the southern Stateline of Minnesota west of Lyle. In 2006 CN went all the way to Glenville for an ethanol loadout.
In 2016 the Cedar River stopped going past London, MN, to Glenville. On September 18, 2019, the Osage Sub was shorten in the timetable to MP 83.6. All the trackage west of there to Glenville is now other than main track on has been out of service for awhile. Looking at Goggle Earth, the switch isn't in here anymore.
Scanned slide from September 2006.
IC 6010 Westbound at Myrtle MN
The Cedar River local crew back in 2006 passes thru Myrtle on the way to the end of the line at Glenville. The Osage Sub runs for about 18 miles along the southern Stateline of Minnesota west of Lyle. In 2006 CN went all the way to Glenville for an ethanol loadout.
In 2016 the Cedar River stopped going past London, MN, to Glenville. On September 18, 2019, the Osage Sub was shorten in the timetable to MP 83.6. All the trackage west of there to Glenville is now other than main track on has been out of service for awhile. Looking at Goggle Earth, the switch isn't in here anymore.
Scanned slide from September 2006.