CP 6230 Southbound B67 at Clinton IA
I have had depot torn down on me that I didn't even know they were going to come down til I came back by. So when I hear the CP B67 local coming out of Sabula towards Clinton, I figured I would make the most of it. After work at Lyons, the crew now crosses the UP Clinton Sub here at 5th Street. The train is passing the old CN&W depot here at 5th Street. In 2017 the UP bought this property in preparation for a new bridge that will be built in 2021. The Union Pacific plans to build a $400 million clear span bridge over the Mississippi River to replace the swing span bridge built in 1909. I am unsure the plans for the depot currently. The crew heads down to the yard by ADM to swap cars before heading back to Savanna.
CP 6230 Southbound B67 at Clinton IA
I have had depot torn down on me that I didn't even know they were going to come down til I came back by. So when I hear the CP B67 local coming out of Sabula towards Clinton, I figured I would make the most of it. After work at Lyons, the crew now crosses the UP Clinton Sub here at 5th Street. The train is passing the old CN&W depot here at 5th Street. In 2017 the UP bought this property in preparation for a new bridge that will be built in 2021. The Union Pacific plans to build a $400 million clear span bridge over the Mississippi River to replace the swing span bridge built in 1909. I am unsure the plans for the depot currently. The crew heads down to the yard by ADM to swap cars before heading back to Savanna.