Dear OSHA,
It's only holding the lower gate open on a scissor lift but still. Our sheetrock contractor is a badass; days ahead of schedule, up to 16 people working at one time, all steel studs and 12' sheets of rock.
189
views
0
faves
0
comments
Uploaded on September 22, 2011
Taken on September 21, 2011
Dear OSHA,
It's only holding the lower gate open on a scissor lift but still. Our sheetrock contractor is a badass; days ahead of schedule, up to 16 people working at one time, all steel studs and 12' sheets of rock.
189
views
0
faves
0
comments
Uploaded on September 22, 2011
Taken on September 21, 2011