Increased capacity
A slow day after a works Christmas do yesterday and my planned trip to York was scuppered by rail strikes. Looking at RTT there was a 4H89 Hams Hall to Hillhead Sidings. I'd not been to this location since the sidings were installed increasing the capacity for loading.
I timed my arrival around the time 6H52 13:05 Dowlow Briggs to Ashburys was due to leave.
968
views
16
faves
0
comments
Uploaded on December 8, 2023
Taken on December 8, 2023
Increased capacity
A slow day after a works Christmas do yesterday and my planned trip to York was scuppered by rail strikes. Looking at RTT there was a 4H89 Hams Hall to Hillhead Sidings. I'd not been to this location since the sidings were installed increasing the capacity for loading.
I timed my arrival around the time 6H52 13:05 Dowlow Briggs to Ashburys was due to leave.
968
views
16
faves
0
comments
Uploaded on December 8, 2023
Taken on December 8, 2023