Every changing railway
37409 hauls 57303, 20107 and 20096 plus 5 mark 2 coaches recovered from Harry Needle, previously stored at Worksop for future use by Locomotive Services Limited. 5Z63 12:49 Worksop Down Yard to Crewe Holding Sidings.
To the left the dualing of the Hope Valley line continues with the construction of a new platform at Dore & Totley station and a new footbridge.
2,408
views
50
faves
8
comments
Uploaded on November 29, 2023
Taken on November 29, 2023
Every changing railway
37409 hauls 57303, 20107 and 20096 plus 5 mark 2 coaches recovered from Harry Needle, previously stored at Worksop for future use by Locomotive Services Limited. 5Z63 12:49 Worksop Down Yard to Crewe Holding Sidings.
To the left the dualing of the Hope Valley line continues with the construction of a new platform at Dore & Totley station and a new footbridge.
2,408
views
50
faves
8
comments
Uploaded on November 29, 2023
Taken on November 29, 2023