Workload is piling up
66747 has pulled up to a halt and is being refuelled as the containers are being unloaded. This is the area of the former reception sidings.
The front of the train will be unloaded from here and then drawn forward for the next section. At which point the loco will run around and back the remainder of the train for unloading. The train will them draw forward as it is loaded and off back to Felixstowe. Credit to GBRF at 747 has run since commencement of services.
Workload is piling up
66747 has pulled up to a halt and is being refuelled as the containers are being unloaded. This is the area of the former reception sidings.
The front of the train will be unloaded from here and then drawn forward for the next section. At which point the loco will run around and back the remainder of the train for unloading. The train will them draw forward as it is loaded and off back to Felixstowe. Credit to GBRF at 747 has run since commencement of services.