DSC_6918 Stabled
A four hour drive Dorchester to Sheffield, even 2 hours at Bramall Lane wasn't enough fresh air for a Boxing Day. A mid evening break to check on the engineering works at Sheffield station. Platform 2C buffers appear to be replaced, although the track works into 7 less so, which probably explains why 56087 was still waiting to leave.
889
views
15
faves
2
comments
Uploaded on December 26, 2019
Taken on December 26, 2019
DSC_6918 Stabled
A four hour drive Dorchester to Sheffield, even 2 hours at Bramall Lane wasn't enough fresh air for a Boxing Day. A mid evening break to check on the engineering works at Sheffield station. Platform 2C buffers appear to be replaced, although the track works into 7 less so, which probably explains why 56087 was still waiting to leave.
889
views
15
faves
2
comments
Uploaded on December 26, 2019
Taken on December 26, 2019