~ydoc~
BW Swift
BW Swift unloads clean petroleum products in Devonport. This is their last port before heading back to Kwinana after unloading approximately 49,000t of CPP between Hobart, Burnie and Devonport.
GENERAL
IMO: 9713844 | MMSI: 563881000 | Callsign: 9V2926 | Flag: Singapore | Port of Registry: Singapore | Owner: BW Clearwater Pte Ltd | Manager: BW Fleet Management Pte. Ltd
BUILD
Hull No: S1183 | Shipbuilder: SPP Shipbuilding Co., Ltd.- Goseong Shipyard | Date of Keel Lay: 28 July 2015 | Date of Launch: 13 October 2015 | Date of Build: 26 January 2016 | Launched as: BW Swift
CAPACITY & MEASUREMENTS
Length Overall: 183.065 m | Length Between Perpendiculars: 174.018 m | Breath, Moulded: 32.233 m | Depth, Moulded: 19.1 m | Draught: 13.283 m | Freeboard: 5,817mm | Deadweight Tonnage: 49,999 | Gross Tonnage: 29,751t | Net Tonnage: 13,758 t | Capacity, Ballast: 22391.2 m3
CLASSIFICATION
1A1 Tanker for chemicals and oil BIS BWM(T) Clean COAT-PSPC(B) COMF(V-3) COW CSR E0 ESP Recyclable SPM TMON VCS(2) under the Det Norske Veritas Germanischer Lloyd class society as Class Number 33942. Medium Range.
ENGINE
Engine Type: 1x MAN Diesel & Turbo 6S50ME-B | Bore x Stroke: 500 x 2,214mm | Power: 8,900-16,020 kW | Revolution: 117.0 rpm | Boilers: 1x Auxiliary vertical boiler | Boiler Manufacturer: Kangrim | Generators: Hyundai Heavy Industries 5H21/32 | Propeller: Fixed pitch propeller by Hye Yang Metal CP Ltd | Continuous Max. Speed: 14 kt
IMAGE INFORMATION
Camera: Nikon D3300 | Lens: Nikon 55-200mm f4.5-5.6 | Shutter: 1.3 sec | Aperture: | ISO: 100 | Focal Length: 110mm APS-C | Tripod and self timer used.
LOCATION
Taken from the Spirit of Tasmania terminal observation deck in East Devonport, Australia.
Source of ship information:
BW Swift
BW Swift unloads clean petroleum products in Devonport. This is their last port before heading back to Kwinana after unloading approximately 49,000t of CPP between Hobart, Burnie and Devonport.
GENERAL
IMO: 9713844 | MMSI: 563881000 | Callsign: 9V2926 | Flag: Singapore | Port of Registry: Singapore | Owner: BW Clearwater Pte Ltd | Manager: BW Fleet Management Pte. Ltd
BUILD
Hull No: S1183 | Shipbuilder: SPP Shipbuilding Co., Ltd.- Goseong Shipyard | Date of Keel Lay: 28 July 2015 | Date of Launch: 13 October 2015 | Date of Build: 26 January 2016 | Launched as: BW Swift
CAPACITY & MEASUREMENTS
Length Overall: 183.065 m | Length Between Perpendiculars: 174.018 m | Breath, Moulded: 32.233 m | Depth, Moulded: 19.1 m | Draught: 13.283 m | Freeboard: 5,817mm | Deadweight Tonnage: 49,999 | Gross Tonnage: 29,751t | Net Tonnage: 13,758 t | Capacity, Ballast: 22391.2 m3
CLASSIFICATION
1A1 Tanker for chemicals and oil BIS BWM(T) Clean COAT-PSPC(B) COMF(V-3) COW CSR E0 ESP Recyclable SPM TMON VCS(2) under the Det Norske Veritas Germanischer Lloyd class society as Class Number 33942. Medium Range.
ENGINE
Engine Type: 1x MAN Diesel & Turbo 6S50ME-B | Bore x Stroke: 500 x 2,214mm | Power: 8,900-16,020 kW | Revolution: 117.0 rpm | Boilers: 1x Auxiliary vertical boiler | Boiler Manufacturer: Kangrim | Generators: Hyundai Heavy Industries 5H21/32 | Propeller: Fixed pitch propeller by Hye Yang Metal CP Ltd | Continuous Max. Speed: 14 kt
IMAGE INFORMATION
Camera: Nikon D3300 | Lens: Nikon 55-200mm f4.5-5.6 | Shutter: 1.3 sec | Aperture: | ISO: 100 | Focal Length: 110mm APS-C | Tripod and self timer used.
LOCATION
Taken from the Spirit of Tasmania terminal observation deck in East Devonport, Australia.
Source of ship information:
