July 4, 2006 - Installing wind turbine
Bob McCullough and Ken Compton from Zeus Power Systems are installing a wind power generator and solar panel. This set up will initially provide enough power to build Larry Turgeon's Flax Manufacturing building. It includes four batteries, an inverter, solar panel, and wind generator. The wind generator is placed on top of the post that can be easily lowered for testing and maintenance.
July 4, 2006 - Installing wind turbine
Bob McCullough and Ken Compton from Zeus Power Systems are installing a wind power generator and solar panel. This set up will initially provide enough power to build Larry Turgeon's Flax Manufacturing building. It includes four batteries, an inverter, solar panel, and wind generator. The wind generator is placed on top of the post that can be easily lowered for testing and maintenance.