johnnyh4
RETINA III S re-stringing and completion - 4
The cord is reinstalled according to the Retina III S Service Instructions.
The meter film speed was set to 10 ASA and the match needle to the minimum light postion marker.
The drive drum gear was in the position set by the speed being at B and the aperture at 1.9 .
The temporary cord clamping screw & washer was used in conjunction with the tensioner to allow each end of the cord to be manipulated separately.
RETINA III S re-stringing and completion - 4
The cord is reinstalled according to the Retina III S Service Instructions.
The meter film speed was set to 10 ASA and the match needle to the minimum light postion marker.
The drive drum gear was in the position set by the speed being at B and the aperture at 1.9 .
The temporary cord clamping screw & washer was used in conjunction with the tensioner to allow each end of the cord to be manipulated separately.