Dutch-builder
Dutch-builder
Office Sideview
After a few days the building i drew is finally realized. The 3 floor office building of DB-Design and Engineering is finished.
(more pictures to follow)
1,641
views
2
faves
0
comments
Uploaded on September 15, 2012
Taken on September 15, 2012
Office Sideview
After a few days the building i drew is finally realized. The 3 floor office building of DB-Design and Engineering is finished.
(more pictures to follow)
1,641
views
2
faves
0
comments
Uploaded on September 15, 2012
Taken on September 15, 2012