Technical Section

1.Basement Construction

750mm R.C Concrete Foundation

30mm Asphalt Tanking to BS 8102

50mm protective screed

100mm Mineral wool

100mm Blockwork

 

2.G.F Construction

Corus Airdek™ System

254x146mm ASB Beams to BS EN10056:1999

250mm dia Columns to BS EN10056:1999

200x100mm RHSB Beams to BS EN10056:1999

5mm D.P.C

50mm Mineral Wool

12mm Plasterbard Ceiling on frame

 

3.Wall Construction

Double glazed 8mm laminated safety glass to BS 6262

Aluminium Frame to BS 8731

Silicon Fixing

 

2.F.F Construction

Corus Airdek™ System

254x146mm ASB Beams to BS EN10056:1999

250mm dia Columns to BS EN10056:1999

200x100mm RHSB Beams to BS EN10056:1999

5mm D.P.C

50mm Mineral Wool

150mm Kingspan Europed Raised Acces Floor

12mm Plasterbard Ceiling on frame

12mm Fibre Re-inforced Concrete Panels on frame

 

 

5.Wall Construction

Double glazed 8mm Pilkington Activ™ glass

Aluminium Frame to BS 8731

Silicon Fixing

Trickle Vents

100mm dia Columns

Adjustable Aluminium louvres on frame

 

6.Roof Construction

Double glazed 8mm Pilkington Activ™ glass

Aluminium Frame to BS 8731

Silicon Fixing

KS500/1000 zip Kingzip™ Standing Seam Roof System

 

7.Wall Construction

Composite Cladding Panels

Light Panels

75mm Rigid Insulation

Moulded Fibreglass Inetrior

5mm D.P.C