Yards and Sidings can be mucky and grimy places and the track work leaves a lot to be desired In august 2007 EWS 66139 is seen being loaded with Imported coal at the Hargreaves loading pad in Reception sdg's once loaded the train ran to Eggbrough Power Station as 6C45 in the distance can be seen an UID 66 discharging its train of South Welsh Anthracite coal in the CPL discharge pad and the yard pilot is seen moving some BXI wagons from Nordic Terminal into the yard.