Back to photostream

P2509-P2501-P2516 westbound ore

After waiting in the loop for the ACN- hauled empty train to run by, P2509 and its loaded train got under way, enroute to the discharge facility at the Port of Geraldton.

497 views
4 faves
0 comments
Uploaded on December 10, 2016
Taken on September 18, 2015