The opening of the Connaught Bridge Generating Station, on the Klang River in Selangor, in March 1953 was a real milestone int he history of what was then Malaya - now Malaysia. The power station, capable of being either coal or oil fired, was at 80,000kw by far the largest generating station at the time in the country and, as importantly, the project included elements of a new proposed Malayan 'National Grid' that linked existing stations such as the hydro-electric plant at Chenderoh with stations and locations along the East Coast centred on the Bungsar station in Kuala Lumpur that hitherto had supplied the bulk of the capital's power requirements. As the booklet notes it meant an end to the long post-war years of restriction of supply to both industrial and domestic consumers.
The station was originally planned in 1944 by the Malayan Planning Unit in London in anticipation of the return to Malaya after the end of the Japanses occupation. A provisional order for the equipment was placed in 1945, with additional equipment following in 1947. Meanwhile the site at Connaught Bridge alongside the Klang River was selected in 1946 with the contract to start construction given by the Federation's Government in 1949. The first phase of the station, plant and the double circuit 66kv interconnecting lines running the 23 miles to Kuala Lumpur, was ready for opening in March 1953. Full commissioning came in 1955. Initailly the output was linked to the Bangsar (KL) station and that of Ulu Langat hydro-electric station. Construction of the former had started in 1926 and was opened in 1927 by the Government electricity department and in 1933 they purchased the Ulu Langat station from the Sungei Besi Mines Ltd. KL's earlier supplies, from 1905, had been provided from a small hydro-electric plant on the Gombak River, 12 miles from the town, what had two 400kw Pelton wheel-alternators. This had been augmented in 1919 by a mixed steam and diesel engine plant at Gombak Lane in the centre of KL.
Elsewhere, Penang's Municipal Department was the first to supply electriicty within Malaya when it started in 1904 - the station on the mainland at Prai came into use in 1926. By this date electricity was available in Ipoh, Johore Bahru (and Singapore), Seremban and Malacca/Melaka. That at Johore Bahru under the Johore adminsitraion grew to include Muar, Batu Pahat, Kluang, Kota Tinggi and Segamat. In Perak supplies were largely in the hands of the Perak River Hydro-Electric Power Company who operated stations at Malim Nawar (1928) and Chenderoh (1929). In North Perak the Government supplied Taiping and in Province Wellesley Messrs. Huttenbach's bought bulk supply from Penang and supplied power to various towns, supplemented by diesel generating stations in Kedah, Perak and Negri Sembilan. Power came to Kota Bharu (Kelantan), Ruab, Bentong, Kuala Lipis and Kuantan between 1928 and 1931, and in 1938 and 1939 to Mentakab, Fraser's Hill and Kuala Kubu.
In 1946 the Malayan Union Government acquired most electricity undertakings except those of private companies and Penang Corporation whilst it also fully acquired the undertkaing operated by the Malacca Electric Light Company in 1948 that it has previously run on a rental basis. On the 1 September 1949 the new Central Electricity Board of the Federation fo Malaya came into existance and took over all functions of the old Electricity Department.
The booklet is marvellously detailed and illustrated describing the site, the power station, ancilliary equipment and other works, such as staff accomodaton and housing, with photographs and plans. The latter include a map of the proposed Malayan Grid and the plans show the works designed by both the staff of the Central Electricity Board and the consulting engineers, Preece, Cardew and Rider, and civil engineers Coode and Partners. The station took cooling water from the Klang River and could be powered by either fuel oil (via a pipeline from Port Swettenham) and coal via connections with the Malayan Railways and the colliery at Batu Arang.
Needless to say much of the equipment was supplied from the UK - Parsons generators and transformers and switchgear from various manufacturers including British Thomson Houston.
The photos are great as they show named members of the operating staff at work which is unusual but that now provided a real social history to the economic history of electricity supply in Malaysia.
Connaught Bridge Power Station : opening ceremony book - 26 March 1953 : Central Electricity Board of the Federation of Malaya : Government Printing Department, Kuala Lumpur, Malaya : 1953
The opening of the Connaught Bridge Generating Station, on the Klang River in Selangor, in March 1953 was a real milestone int he history of what was then Malaya - now Malaysia. The power station, capable of being either coal or oil fired, was at 80,000kw by far the largest generating station at the time in the country and, as importantly, the project included elements of a new proposed Malayan 'National Grid' that linked existing stations such as the hydro-electric plant at Chenderoh with stations and locations along the East Coast centred on the Bungsar station in Kuala Lumpur that hitherto had supplied the bulk of the capital's power requirements. As the booklet notes it meant an end to the long post-war years of restriction of supply to both industrial and domestic consumers.
The station was originally planned in 1944 by the Malayan Planning Unit in London in anticipation of the return to Malaya after the end of the Japanses occupation. A provisional order for the equipment was placed in 1945, with additional equipment following in 1947. Meanwhile the site at Connaught Bridge alongside the Klang River was selected in 1946 with the contract to start construction given by the Federation's Government in 1949. The first phase of the station, plant and the double circuit 66kv interconnecting lines running the 23 miles to Kuala Lumpur, was ready for opening in March 1953. Full commissioning came in 1955. Initailly the output was linked to the Bangsar (KL) station and that of Ulu Langat hydro-electric station. Construction of the former had started in 1926 and was opened in 1927 by the Government electricity department and in 1933 they purchased the Ulu Langat station from the Sungei Besi Mines Ltd. KL's earlier supplies, from 1905, had been provided from a small hydro-electric plant on the Gombak River, 12 miles from the town, what had two 400kw Pelton wheel-alternators. This had been augmented in 1919 by a mixed steam and diesel engine plant at Gombak Lane in the centre of KL.
Elsewhere, Penang's Municipal Department was the first to supply electriicty within Malaya when it started in 1904 - the station on the mainland at Prai came into use in 1926. By this date electricity was available in Ipoh, Johore Bahru (and Singapore), Seremban and Malacca/Melaka. That at Johore Bahru under the Johore adminsitraion grew to include Muar, Batu Pahat, Kluang, Kota Tinggi and Segamat. In Perak supplies were largely in the hands of the Perak River Hydro-Electric Power Company who operated stations at Malim Nawar (1928) and Chenderoh (1929). In North Perak the Government supplied Taiping and in Province Wellesley Messrs. Huttenbach's bought bulk supply from Penang and supplied power to various towns, supplemented by diesel generating stations in Kedah, Perak and Negri Sembilan. Power came to Kota Bharu (Kelantan), Ruab, Bentong, Kuala Lipis and Kuantan between 1928 and 1931, and in 1938 and 1939 to Mentakab, Fraser's Hill and Kuala Kubu.
In 1946 the Malayan Union Government acquired most electricity undertakings except those of private companies and Penang Corporation whilst it also fully acquired the undertkaing operated by the Malacca Electric Light Company in 1948 that it has previously run on a rental basis. On the 1 September 1949 the new Central Electricity Board of the Federation fo Malaya came into existance and took over all functions of the old Electricity Department.
The booklet is marvellously detailed and illustrated describing the site, the power station, ancilliary equipment and other works, such as staff accomodaton and housing, with photographs and plans. The latter include a map of the proposed Malayan Grid and the plans show the works designed by both the staff of the Central Electricity Board and the consulting engineers, Preece, Cardew and Rider, and civil engineers Coode and Partners. The station took cooling water from the Klang River and could be powered by either fuel oil (via a pipeline from Port Swettenham) and coal via connections with the Malayan Railways and the colliery at Batu Arang.
Needless to say much of the equipment was supplied from the UK - Parsons generators and transformers and switchgear from various manufacturers including British Thomson Houston.
The photos are great as they show named members of the operating staff at work which is unusual but that now provided a real social history to the economic history of electricity supply in Malaysia.