TRITEC Projects
New Village Aerial Photographs 7/16/13
Since our last photo…
Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.
Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.
Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.
New Village Aerial Photographs 7/16/13
Since our last photo…
Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.
Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.
Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.