New Village Patchogue 121412 04

This aerial photograph represents construction progress for the New Village project, a 291 unit mixed-use development, as of December 14, of 2012. The phase of the project includes the site and concrete foundation development progressing at Buildings 3, 5, and 1 which are the Westerly most and Easterly most portions of the structure. Structural mat slabs, ramps and perimeter foundation walls are progressing at the Building's 5 and 1 located along the East side of the site. The entire mat slab and perimeter foundation is complete at Building 3 along the West side of the site and the post tension elevated slab is 80 % complete at the same Building. The sub grade structure is being excavated for Building 2 (at center of site) and the subsurface waterproofing membrane is being installed at spread footing locations. Additional scope that is progressing at this time includes the Mechanical, Electrical and Plumbing scope that is being installed within and below slabs.

582 views
0 faves
0 comments
Uploaded on January 11, 2013
Taken on December 14, 2012