PanamaCanal- Control Tower
All movement of water is handled by operators in the red-roofed control building in the center of each of the locks. Switches for the lock gates are mechanically linked to prevent out of sequence operation as a ship is lifted.
406
views
1
fave
0
comments
Uploaded on March 30, 2017
Taken on January 25, 2017
PanamaCanal- Control Tower
All movement of water is handled by operators in the red-roofed control building in the center of each of the locks. Switches for the lock gates are mechanically linked to prevent out of sequence operation as a ship is lifted.
406
views
1
fave
0
comments
Uploaded on March 30, 2017
Taken on January 25, 2017