Back to photostream

PanamaCanal- Control Tower

All movement of water is handled by operators in the red-roofed control building in the center of each of the locks. Switches for the lock gates are mechanically linked to prevent out of sequence operation as a ship is lifted.

406 views
1 fave
0 comments
Uploaded on March 30, 2017
Taken on January 25, 2017