Oosterdam departure 1
The extreme length of the Oosterdam means that in order to get into the shipping channel, it needs to horizontally move past the Opera House before turning around.
600
views
1
fave
0
comments
Uploaded on December 2, 2012
Taken on November 21, 2012
Oosterdam departure 1
The extreme length of the Oosterdam means that in order to get into the shipping channel, it needs to horizontally move past the Opera House before turning around.
600
views
1
fave
0
comments
Uploaded on December 2, 2012
Taken on November 21, 2012