gerrit carstensen
gerrit carstensen
Progress
this is the first of two interlockings I am building to fit with the OhioLug layouts. This one is built so it can be packed up and set up tabletop with minimal hassle. Power for the signals is centralized in the cabinet next to the far right signal.
2,929
views
18
faves
8
comments
Uploaded on April 4, 2016
Progress
this is the first of two interlockings I am building to fit with the OhioLug layouts. This one is built so it can be packed up and set up tabletop with minimal hassle. Power for the signals is centralized in the cabinet next to the far right signal.
2,929
views
18
faves
8
comments
Uploaded on April 4, 2016