Multipurpose Vessel "Voe Vanguard" Working Off Marske For the Sofia Wind Farm Shore End Investigation
Delta Marine was founded in 1985 and are based in Lerwick
In December 2019 they were taken over by French firm JIFMAR Offshore Services
Voe Vanguard – DP2 Renewables Service Vessel
This vessel creates a niche market for workboats based on the successful Multicat® design.
Bespoke design type RSV3315 (Renewables Service Vessel) can undertake all duties normally expected of a Multicat® with the addition of clear deck space, DP2 and dedicated 4 point mooring.
Work scopes for the vessel include –
Cable Laying, PLGR, ROV support, Dive support, Heavy mooring system install, Mattress/Rock bag install, Tidal generator install, Towage/Salvage.
Bollard Pull ahead 39.2ton (certified)
Bollard Pull astern 40.6ton (certified)
Bollard Pull side thrust 35.0ton (approx)
Speed 10.5knots
Main Generators 2 x 2125kVA
Thrusters 2 x 480 bkW + 2 x 800 bkW
Dynamic Positioning System Kongsberg K-POS DP-21
Length 33.18m
Beam 14.50m
Draft 2.62m
Free deck space 300m2
Fuel 135.0m3
Freshwater 81.7m3
Cranes
1 x 15t @ 20m, Winch 10.8t/21t
1 x 9t @ 21m, Winch 10.8t/21t
AH/Towing winch 150t pull, 200t brake
Mooring spread 4 x 12t pull, 22t brake. 400m x 25mm
Shark Jaws 2 x Sets Triplex H-200t
Guide Pins 1 x Set Triplex S-115t
Stop Pins 2 x WK 400
Accommodation (Standard) 15 berths
Accommodation (Maximum) 20 berths
Multipurpose Vessel "Voe Vanguard" Working Off Marske For the Sofia Wind Farm Shore End Investigation
Delta Marine was founded in 1985 and are based in Lerwick
In December 2019 they were taken over by French firm JIFMAR Offshore Services
Voe Vanguard – DP2 Renewables Service Vessel
This vessel creates a niche market for workboats based on the successful Multicat® design.
Bespoke design type RSV3315 (Renewables Service Vessel) can undertake all duties normally expected of a Multicat® with the addition of clear deck space, DP2 and dedicated 4 point mooring.
Work scopes for the vessel include –
Cable Laying, PLGR, ROV support, Dive support, Heavy mooring system install, Mattress/Rock bag install, Tidal generator install, Towage/Salvage.
Bollard Pull ahead 39.2ton (certified)
Bollard Pull astern 40.6ton (certified)
Bollard Pull side thrust 35.0ton (approx)
Speed 10.5knots
Main Generators 2 x 2125kVA
Thrusters 2 x 480 bkW + 2 x 800 bkW
Dynamic Positioning System Kongsberg K-POS DP-21
Length 33.18m
Beam 14.50m
Draft 2.62m
Free deck space 300m2
Fuel 135.0m3
Freshwater 81.7m3
Cranes
1 x 15t @ 20m, Winch 10.8t/21t
1 x 9t @ 21m, Winch 10.8t/21t
AH/Towing winch 150t pull, 200t brake
Mooring spread 4 x 12t pull, 22t brake. 400m x 25mm
Shark Jaws 2 x Sets Triplex H-200t
Guide Pins 1 x Set Triplex S-115t
Stop Pins 2 x WK 400
Accommodation (Standard) 15 berths
Accommodation (Maximum) 20 berths