Back to photostream

Loads at the Edgewater switch

Conductor Bryan checks the points and throws the switch to allow loads to ease downgrade towards Edgewater this AM.

516 views
6 faves
2 comments
Uploaded on December 12, 2021
Taken on December 12, 2021