Back to album

Conductor Jayson

With YSB52 on the other side of Taylor Dr and the Edgewater switch thrown, conductor Jayson leans back to take a stretch. His engineer was slowly bringing the power up onto the main line.

800 views
3 faves
0 comments
Uploaded on August 1, 2015
Taken on July 31, 2015