US Air Force | 2013 Lockheed Martin HC-130J Combat King II | cn 382-5725 | 11-5725
KLFI (Joint Base Langley-Eustis / Langley AFB) - 21 APR 2016
USAF Lockheed Martin HC-130J Combat King II 11-5725 with the 71st RQS, 347th RQW based at Moody AFB, GA on landing approach to RWY 26 to be displayed at the 2016 Air Power Over Hampton Roads airshow.
The HC-130J features improved navigation, threat detection and countermeasure systems, among other additions. It has been at Moody since July 2013.
The HC-130J replaces HC-130P/Ns as the only dedicated fixed-wing Personnel Recovery platform in the Air Force inventory. It is an extended-range version of the C-130J Hercules transport. Its mission is to rapidly deploy to execute combatant commander directed recovery operations to austere airfields and denied territory for expeditionary, all weather personnel recovery operations to include airdrop, airland, helicopter air-to-air refueling, and forward area ground refueling missions. When tasked, the aircraft also conducts humanitarian assistance operations, disaster response, security cooperation/aviation advisory, emergency aeromedical evacuation, and noncombatant evacuation operations.
General Characteristics
Primary function: Fixed-wing Personnel Recovery platform
Contractor: Lockheed Aircraft Corp.
Power Plant: Four Rolls Royce AE2100D3 turboprop engines
Thrust: 4,591 Propeller Shaft Horsepower, each engine
Wingspan: 132 feet, 7 inches (40.4 meters)
Length: 97 feet, 9 inches (29.57 meters)
Height: 38 feet, 9 inches (11.58 meters)
Operating Weight: 89,000 pounds (40,369 kilograms)
Maximum Takeoff Weight: 164,000 pounds (74,389 kilograms)
Fuel Capacity: 61,360 pounds (9,024 gallons)
Payload: 35,000 pounds (15,875 kilograms)
Speed: 316 knots indicated air speed at sea level
Range: beyond 4,000 miles (3,478 nautical miles)
Ceiling: 33,000 feet (10,000 meters)
Armament: countermeasures/flares, chaff
Basic Crew: Three officers (pilot, co-pilot, combat system officer) and two enlisted loadmasters
Unit Cost: $66 million (fiscal 2010 replacement cost)
Initial operating capability: 2013
US Air Force | 2013 Lockheed Martin HC-130J Combat King II | cn 382-5725 | 11-5725
KLFI (Joint Base Langley-Eustis / Langley AFB) - 21 APR 2016
USAF Lockheed Martin HC-130J Combat King II 11-5725 with the 71st RQS, 347th RQW based at Moody AFB, GA on landing approach to RWY 26 to be displayed at the 2016 Air Power Over Hampton Roads airshow.
The HC-130J features improved navigation, threat detection and countermeasure systems, among other additions. It has been at Moody since July 2013.
The HC-130J replaces HC-130P/Ns as the only dedicated fixed-wing Personnel Recovery platform in the Air Force inventory. It is an extended-range version of the C-130J Hercules transport. Its mission is to rapidly deploy to execute combatant commander directed recovery operations to austere airfields and denied territory for expeditionary, all weather personnel recovery operations to include airdrop, airland, helicopter air-to-air refueling, and forward area ground refueling missions. When tasked, the aircraft also conducts humanitarian assistance operations, disaster response, security cooperation/aviation advisory, emergency aeromedical evacuation, and noncombatant evacuation operations.
General Characteristics
Primary function: Fixed-wing Personnel Recovery platform
Contractor: Lockheed Aircraft Corp.
Power Plant: Four Rolls Royce AE2100D3 turboprop engines
Thrust: 4,591 Propeller Shaft Horsepower, each engine
Wingspan: 132 feet, 7 inches (40.4 meters)
Length: 97 feet, 9 inches (29.57 meters)
Height: 38 feet, 9 inches (11.58 meters)
Operating Weight: 89,000 pounds (40,369 kilograms)
Maximum Takeoff Weight: 164,000 pounds (74,389 kilograms)
Fuel Capacity: 61,360 pounds (9,024 gallons)
Payload: 35,000 pounds (15,875 kilograms)
Speed: 316 knots indicated air speed at sea level
Range: beyond 4,000 miles (3,478 nautical miles)
Ceiling: 33,000 feet (10,000 meters)
Armament: countermeasures/flares, chaff
Basic Crew: Three officers (pilot, co-pilot, combat system officer) and two enlisted loadmasters
Unit Cost: $66 million (fiscal 2010 replacement cost)
Initial operating capability: 2013