Back to photostream

sep 19 08 T&G get peel and seal

The crew installs peel and seal composite material to upper surface ot toungue and groove roofing boards in an effort to seal out moisture while the rest of the structure is assembled

85 views
0 faves
0 comments
Uploaded on October 6, 2008
Taken on September 18, 2008