Back to album

Double Header 37’s at Dove Holes Tunnel, Peak Forest

It's close on 3.30 and getting dark quickly as 37677 and 37679 finally appear with 7F50 the Tunstead to Oakleigh and Lostock working. The train is just about to enter Tunnel Number 92 "Dove Holes Tunnel" which is 2984 yards in length.

 

Nikon 801

80/200mm/F2.8

125/F2.8

Kodachrome 200

980 views
13 faves
6 comments
Uploaded on July 13, 2024
Taken on February 2, 1992