Back to photostream

Keep on Rolling

At the end of the work day, pipe that was permanently laid was back-filled with gravel and capped with asphalt. In the areas where work has yet to be completed, massive steel plates are used to cover the open trenches; held in place with spikes and then the edges are covered in asphalt. Roller compacts and smooths out the asphalt.

140 views
0 faves
0 comments
Uploaded on March 2, 2011
Taken on March 1, 2011