Back to photostream

AC power construction site

Every action does need one week, instead of 4 hours. Today they begin to make the water flatter, that the carps die during the Winter. The water gauge will be too flat.

446 views
0 faves
0 comments
Uploaded on April 12, 2017
Taken on April 12, 2017