A Piece of Track Hoisted over Daikan-yama Station
Shibuya Station Tokyu Toyoko Line was moved to underground on March 16. This photo shows the track switching work performed at Daikan-yama Station.
The entrance to the new tunnel had been covered with the old track. The old track was removed this night. The piece of track shown in this photo should be a part of it.
261
views
1
fave
0
comments
Uploaded on June 2, 2013
Taken on March 16, 2013
A Piece of Track Hoisted over Daikan-yama Station
Shibuya Station Tokyu Toyoko Line was moved to underground on March 16. This photo shows the track switching work performed at Daikan-yama Station.
The entrance to the new tunnel had been covered with the old track. The old track was removed this night. The piece of track shown in this photo should be a part of it.
261
views
1
fave
0
comments
Uploaded on June 2, 2013
Taken on March 16, 2013