This bridge exists at the north of Hon-atsugi Station of Odakyu Line. The elevated road under construction on the other side of the river is Sagami-jukan Road.
Ayumi-bashi had two arches at the beginning of 2012. The road to which the bridge was connected was removed due to Sagami-jukan Road construction to widen the bank. So, the bridge was extended to the next road in 2012. The third arch was added at that time.
Added on 2013/5/2
It appears that the bridge was extended because the bank was widened to prevent flood. The road construction might be the reason to begin flood prevention work, but it is not the direct reason of the bridge extension.
Ayumi-bashi
This bridge exists at the north of Hon-atsugi Station of Odakyu Line. The elevated road under construction on the other side of the river is Sagami-jukan Road.
Ayumi-bashi had two arches at the beginning of 2012. The road to which the bridge was connected was removed due to Sagami-jukan Road construction to widen the bank. So, the bridge was extended to the next road in 2012. The third arch was added at that time.
Added on 2013/5/2
It appears that the bridge was extended because the bank was widened to prevent flood. The road construction might be the reason to begin flood prevention work, but it is not the direct reason of the bridge extension.