Meguro River and Crane in Construction Site of Shutoko Central Circular Shinagawa Route
The rocks in the river are baffle blocks to slow down the flow. They may be related to an underground flood control reservoir under this place.
248
views
1
fave
0
comments
Uploaded on March 27, 2013
Taken on March 11, 2012
Meguro River and Crane in Construction Site of Shutoko Central Circular Shinagawa Route
The rocks in the river are baffle blocks to slow down the flow. They may be related to an underground flood control reservoir under this place.
248
views
1
fave
0
comments
Uploaded on March 27, 2013
Taken on March 11, 2012