Noise and Vibration Indicator at Meguro Line Construction Site
The upper number tells the noise and the lower number tells the vibration.
Tokyu Meguro Line’s track exists in a trench here. Work to make a cover over the trench is under way. The work is scheduled to finish in 2014.