Route 15-Ring Road No.8 Crossing under Construction
Both Ring Road No.8 and Route 15 carry heavy traffic. However, the two roads have less traffic in this area, because of railroad crossings with Keikyu. So, we have a level crossing now.
Since grade separation work of Keikyu is under way, more traffic is expected in near future. So, underpass is being constructed
A photo taken two years before is shown in “Route 15 at the South of Keikyu Kamata Station.”
Route 15-Ring Road No.8 Crossing under Construction
Both Ring Road No.8 and Route 15 carry heavy traffic. However, the two roads have less traffic in this area, because of railroad crossings with Keikyu. So, we have a level crossing now.
Since grade separation work of Keikyu is under way, more traffic is expected in near future. So, underpass is being constructed
A photo taken two years before is shown in “Route 15 at the South of Keikyu Kamata Station.”