Back to album

Pedestrian Bridge at Tomigaya Intersection Replaced

After Shutoko C2 under here completed, the road on the ground level is being constructed.

 

The pedestrian bridge shown in “Pedestrian Bridge with Joint” has been replaced. The construction is not completed yet. An elevator is covered with white sheet.

 

406 views
0 faves
0 comments
Uploaded on July 11, 2012
Taken on May 5, 2012