JR Nanbu Line 205 Series Train on New Track
Grade separation project of Nanbu Line enters new phase after the track for Tachikawa was elevated at the end of 2011. This photo was taken in 2011 January.
Old tracks on the ground are shown along the elevated railroad. One of them is still used. The grade separation work will be finished in 2014.
The arch bridge is shown in “JR Nanbu Line Bridge under Construction.”