Back to album

JAL A350 JA01XJ above Shutoko No.1 Bridge across the Tama River

To minimize road closures during construction, work to replace the bridge over the Tama River on Shutoko (metropolitan expressway) No.1 was carried out by building a new bridge next to the old one and shifting the bridge girders to the side. The bridge replacement work took place from May 27 to June 10, 2023, with the expressway closed to traffic. This photo was taken on the Tokyo side of the bridge on the second day of construction. Work was underway to move the old bridge to the side.

 

My photostream has several photos showing the preparation work of this replacement. For example, “The Bridge of Shutoko No.1 across the Tama River Being Renewed.”

 

42 views
0 faves
0 comments
Uploaded on August 6, 2025
Taken on May 28, 2023