Saikyo Line E233 Series Train Passing by Road-rail Truck for Construction of Yamanote Line Shibuya Station in January 2023: 3
In the previous photo, I mentioned the reconstruction of Sarugaku-hashi over the Yamanote Line. If you look closely at this photo, you can see that there are yellow and black barricades on the bridge, suggesting some construction was going on. After searching online, I found out that this was not reconstruction work, but that a lane was closed for earthquake-proofing work on the ramps on both ends of the bridge. Since only the part of the bridge over the tracks will be replaced, the reinforced slopes should remain in use even after the reconstruction work.
Saikyo Line E233 Series Train Passing by Road-rail Truck for Construction of Yamanote Line Shibuya Station in January 2023: 3
In the previous photo, I mentioned the reconstruction of Sarugaku-hashi over the Yamanote Line. If you look closely at this photo, you can see that there are yellow and black barricades on the bridge, suggesting some construction was going on. After searching online, I found out that this was not reconstruction work, but that a lane was closed for earthquake-proofing work on the ramps on both ends of the bridge. Since only the part of the bridge over the tracks will be replaced, the reinforced slopes should remain in use even after the reconstruction work.