Back to album

Elevated Railroad under Construction beside Daita-bashi Crossing No.7 in August 2022

The track to Hachioji (left side) will be elevated first. Then, the remaining half of the elevated track will be built in the space left open.

78 views
0 faves
0 comments
Uploaded on December 25, 2024
Taken on August 28, 2022