Toei 10-300 Series Train at Chitose-karasuyama No.4 Railroad Crossing 3
The right side of the catenary pole near the tail of the train had been replaced with a silver pole. It seems that the old right pole would interfere with something in the process to elevate the track.
According to Google Street View, the right side of the catenary pole was replaced after 2021 January. It seems that the power line tensioner on it added at the same time.
63
views
0
faves
0
comments
Uploaded on July 25, 2024
Taken on May 29, 2022
Toei 10-300 Series Train at Chitose-karasuyama No.4 Railroad Crossing 3
The right side of the catenary pole near the tail of the train had been replaced with a silver pole. It seems that the old right pole would interfere with something in the process to elevate the track.
According to Google Street View, the right side of the catenary pole was replaced after 2021 January. It seems that the power line tensioner on it added at the same time.
63
views
0
faves
0
comments
Uploaded on July 25, 2024
Taken on May 29, 2022