Tokyo Metro 16000 Series Train on Bridge across the Tama River
Taken on Tama-suido-bashi in 2022 January. A photo taken on the bridge in 2020 September is shown in “Odakyu 3000 Series Trains and Odakyu 4000 Series Train across the Tama River in 2020 September.” The shape of the Tama River had been changed a lot since then. According to documents of Komae City Office, work to excavate the bottom of the Tama River was under way. Google Street View shows that the shape of the river had been restored in 2022 May. The work was done in winter, when we have few floods.
Tokyo Metro 16000 Series Train on Bridge across the Tama River
Taken on Tama-suido-bashi in 2022 January. A photo taken on the bridge in 2020 September is shown in “Odakyu 3000 Series Trains and Odakyu 4000 Series Train across the Tama River in 2020 September.” The shape of the Tama River had been changed a lot since then. According to documents of Komae City Office, work to excavate the bottom of the Tama River was under way. Google Street View shows that the shape of the river had been restored in 2022 May. The work was done in winter, when we have few floods.