A pedestrian bridge will be built here that will pass under the elevated Shinkansen and over the Yokosuka Line tracks. A signboard beside the railroad track states the construction of the pedestrian bridge is scheduled to end in July 2022. As of February 2024, the work has not been completed.
117
views
0
faves
0
comments
Uploaded on February 18, 2024
Taken on November 23, 2021
Saikyo Line E233 Series Train Running near Futaba Tunnel 2
A pedestrian bridge will be built here that will pass under the elevated Shinkansen and over the Yokosuka Line tracks. A signboard beside the railroad track states the construction of the pedestrian bridge is scheduled to end in July 2022. As of February 2024, the work has not been completed.