E235 Series Train Leaving Shibuya Station at the End of 2021 October
The building under construction is shown at the right edge of this photo. It is Shibuya Sakura Stage Shibuya Tower. As shown in “Construction Site beside JR Shibuya Station in 2021 June: 2,” the building did not exist in 2021 June. Construction of the foundation takes time, but once construction of the main body begins, the work proceeds quick. The thirty-nine-story building opened in 2023 December.
E235 Series Train Leaving Shibuya Station at the End of 2021 October
The building under construction is shown at the right edge of this photo. It is Shibuya Sakura Stage Shibuya Tower. As shown in “Construction Site beside JR Shibuya Station in 2021 June: 2,” the building did not exist in 2021 June. Construction of the foundation takes time, but once construction of the main body begins, the work proceeds quick. The thirty-nine-story building opened in 2023 December.