Platform Doors at JR Nagatsuta Station 2
Trial of this platform doors system was done at Machida Station since 2016 December. The prototype system had narrower frame and wider doors than this mass-production type. JR East replaced the prototype with the mass-production type in 2019. So, I do not have pictures of the prototype.
60
views
0
faves
0
comments
Uploaded on November 11, 2023
Taken on December 19, 2021
Platform Doors at JR Nagatsuta Station 2
Trial of this platform doors system was done at Machida Station since 2016 December. The prototype system had narrower frame and wider doors than this mass-production type. JR East replaced the prototype with the mass-production type in 2019. So, I do not have pictures of the prototype.
60
views
0
faves
0
comments
Uploaded on November 11, 2023
Taken on December 19, 2021