Back to album

At the North Side of Yoyogi-hachiman Station in 2020 December

Those steps beside the station are bridge for cyclists. The construction was scheduled to finish in 2020 March. When I visited this spot in 2020 August, it was not ready. A photo taken at that time is shown in “Bridge over Yoyogi-hachiman Station under Construction in 2020 August.”

 

In this photo, the steps look as if they are surrounded by fence, but the bridge had been opened at that time.

 

54 views
0 faves
0 comments
Uploaded on June 14, 2023
Taken on December 26, 2020