Western Entrance of Underground Section of Keikyu Daishi Line
Taken on a pedestrian bridge across the railroad. It is shown in “West End of Underground Section of Keikyu Daishi Line at the East of Higashimonzen Station in 2021 May.”
There was a railroad crossing at this spot. Since the power line is over the ground at this spot, it was impossible to make a new path on the ground level. A new pedestrian bridge opened in 2019 September, six months after the railroad moved to underground.