JR Shonan-Shinjuku Line E233 Series Train beside Ring Road 6.5 Underpass Construction Site 4
A car and several people were waiting at the crossing. After underpass finally opened in 2021 October, cars do not have to wait here, but pedestrians still have to go across this crossing. It has been announced that a pedestrian bridge will be built in the space between the elevated railroad of Shinkansen and Yokosuka Line track on the ground. It is scheduled to open in 2022 July.
JR Shonan-Shinjuku Line E233 Series Train beside Ring Road 6.5 Underpass Construction Site 4
A car and several people were waiting at the crossing. After underpass finally opened in 2021 October, cars do not have to wait here, but pedestrians still have to go across this crossing. It has been announced that a pedestrian bridge will be built in the space between the elevated railroad of Shinkansen and Yokosuka Line track on the ground. It is scheduled to open in 2022 July.