Shops under Construction at the East of Odakyu Setagaya-daita Station in 2019 September
My photostream has some photos taken on a pedestrian bridge across Odakyu Line at the east of Setagaya-daita Station. For example, “Construction Site at the East of Odakyu Setagaya-daita Station in 2015 August: 2.” The pedestrian bridge was removed in 2017.
This photo was taken near the north end of the old pedestrian bridge. Odakyu Line track existed in the space beyond the trees. The space was going to be turned to a shopping street named “BONUS TRACK.” It opened in 2020 April.
Shops under Construction at the East of Odakyu Setagaya-daita Station in 2019 September
My photostream has some photos taken on a pedestrian bridge across Odakyu Line at the east of Setagaya-daita Station. For example, “Construction Site at the East of Odakyu Setagaya-daita Station in 2015 August: 2.” The pedestrian bridge was removed in 2017.
This photo was taken near the north end of the old pedestrian bridge. Odakyu Line track existed in the space beyond the trees. The space was going to be turned to a shopping street named “BONUS TRACK.” It opened in 2020 April.