Chuo Junction Construction Site in 2019 February
The elevated road is Chuo Expressway. It will have a junction with Gaikan Expressway here.
The signs on the fence say that the road along the expressway was closed for the construction. It is interesting that a sign shows wrong period. It says the road will be closed from 2017 July to 2019 July. In 2018 June, the road where I took this photo was closed, and the sign was telling about it. When the road opened, the road along the expressway was closed in turn. The sign just moved to here. Was the schedule changed? Or the sign told the combined period for the two roads from the beginning?
Memo: At first, I thought the end of the period was 2018 July. I made a mistake when converting Heisei to A.D.
Chuo Junction Construction Site in 2019 February
The elevated road is Chuo Expressway. It will have a junction with Gaikan Expressway here.
The signs on the fence say that the road along the expressway was closed for the construction. It is interesting that a sign shows wrong period. It says the road will be closed from 2017 July to 2019 July. In 2018 June, the road where I took this photo was closed, and the sign was telling about it. When the road opened, the road along the expressway was closed in turn. The sign just moved to here. Was the schedule changed? Or the sign told the combined period for the two roads from the beginning?
Memo: At first, I thought the end of the period was 2018 July. I made a mistake when converting Heisei to A.D.