Road at the Kawasaki Side of Tama-Suido-bashi in 2018 October

This road was temporarily detoured during the construction of the water gate at its left side. A photo taken during the construction is shown in “Construction Site of Outlet of Underground Flood Control Channel in 2017 December: 2.” It was already restored when I took the photo in “Outlet of Underground Flood Control Channel in 2018 August,” but I did not take the restored road in August.