Pedestrian Deck under Construction at the East of JR Hamamatsucho Station
A pedestrian deck between JR Hamamatsucho Station and Takeshiba Pier is being built now. The 500m long elevated walkway will be high enough to cross above the elevated road of Shutoko No.1. It will be opened in 2020 June.
161
views
1
fave
0
comments
Uploaded on January 9, 2020
Taken on August 5, 2018
Pedestrian Deck under Construction at the East of JR Hamamatsucho Station
A pedestrian deck between JR Hamamatsucho Station and Takeshiba Pier is being built now. The 500m long elevated walkway will be high enough to cross above the elevated road of Shutoko No.1. It will be opened in 2020 June.
161
views
1
fave
0
comments
Uploaded on January 9, 2020
Taken on August 5, 2018